Skip to content Skip to footer

Main mission features

The project consists of building the Yaoundé – Douala highway from the Pk100 and the Edéa – Kribi ramp. The project is the sum of three distinct sections:

  • Section 1: the motorway section located between Pk 100 and Pk 134 of the Yaoundé – Douala link, including the east ramp to Edéa
  • Section 2: the section between the east exit of Edéa and Douala, including the west ramp to Edéa and the exit ramps to Douala
  • Section 3: relating to the motorway between Edéa and Kribi.

Activities performed

Jade Advisory supported the client in:

  • Preparation of the tender documents for the PPP project with the specifications and the draft contract and its appendices
  • Transaction advisory
  • Review of the private bidder financial offer, including its financial model.
ClientMinistère des travaux publicsAnnée2020-2023PaysCamerounShare
Office

Tunisia —
31 Rue de l’independance, Bou Mhel el-Bassatine, Ben Arous, Tunisia (LANCER WORKSPACE)

France —
1 Bis Rue Albert 1er 92600 Asnières-sur-Seine, Ile-de-France

United Kingdom —
160 Kemp House, City Road London EC1V 2NX 

Contact us

contact@jade-advisory.org

+33 677 263 653

+216 22 325 237

+44 20 86 38 82 80

Jade Advisory©. All Rights Reserved.